The Material Control Specialist II is responsible in organizing, monitoring & ensuring the accuracy and importation of Engineering & Supplier data into the Material Management System (MMS). They will assist with training and guiding Material Control Specialist 1's with established processes and to monitor progress with workload. Material Control Specialist II's are assigned to mid, large, or mega cap projects. They will also lead data exchange meetings (for joint venture projects) and work with IT on Engineering & Partner data curations.
Physical Requirements:
Employee will be required to communicate in person, via telephone, email, video chat and software systems. Must be able to maneuver around a construction site with rough terrain. Climbing might be required. Must be able to lift 10 lbs. Position may include visits to construction sites and industrial facilities requiring mobility (on ground and at heights) and the use of personal protective equipment (PPE) including but not limited to: hardhat, safety glasses/goggles, ear plugs/muffs, masks/respirators, safety vests, gloves and work boots.
Work Environment:
Employee will work in multiple environments including an office, warehouse and in a trailer or building on construction sites. On construction sites, noise levels will be moderate to high. Job sites may contain the following: light to heavy equipment vehicles, small to large equipment, materials, communication equipment and tools, people standing, walking, sitting, signaling, and talking. Noise levels vary and may include bells, whistles, and alarms.
Zachry Group is dedicated in providing a Safe and Drug Free work environment; and is an Equal Opportunity Employer.