CM Services to Rehabilitate Park Water Systems BIBE 317515
The purpose of the Panther Junction water distribution system improvements project is to replace the existing
aging distribution system and to upgrade it, as necessary, to meet current fire flow and Texas Commission on
Environmental Quality (TCEQ) regulatory requirements.
The scope of this project includes:
Rio Grande Village
The purpose of the Rio Grande Village distribution system improvements is to connect two dead end branches of the existing distribution system with new piping to provide a looped distribution system. In addition to the looped system, all meters in Rio Grande Village will be replaced. Water meters shall be designed to accommodate future water meter improvements in Chisos Basin and Oak Springs. Meters and supporting equipment should allow for integration between all locations (Chisos Basin, Oak Springs and Panther Junction).
Further details:
A CMR will be required for approximately 12 months. The project will not be completed concurrently; however, there may be some concurrent work for a short duration. The CMR shall expect to work between Rio Grande Village and Panther Junction for approximately a month.