N

Data Center Construction Technician (Travel)

Nti Connect
Full-time
On-site
Carrollton, Texas, United States
Β 
National Technologies (A Network Connex Company) is a premier turn-key provider of fiber optic and data center installation services. Whether it be learning the latest techniques in the field or working with vendors to maximize material performance, NTI is consistently on the leading edge of innovation in the Telecommunications field.

If being a part of a tight-knit organization that gets to operate in some of the most innovative environments around the world sounds like a dream job, then you should experience the culture at NTI! While providing the typical perks a large company offers, NTI remains true to its roots and at the core of our Company is a family-oriented business that treats our team as integral members of the organization and not just a number. The open door, collaborative nature of NTI allows for professional growth and cultivates the ideas to keep our Company moving into the future of the industry!


Job Summary & Responsibilities:

  • Unistrut, containment, and overhead support installations
  • Measure and cut accurately, install level and plumb
  • Read and follow drawings, instructions
  • Prepare field notes, interpret engineering drawings in the field, and make recommendations for changes as required
  • Coordinate and communicate activities with other employees, departments, and management
  • Able to travel consistently based on project location


Knowledge, Skills, or Abilities:

  • Knowledge of basic tools, construction practices
  • Carpentry, or Electrical experience


Qualifications & Skills:

  • Good work ethic and willingness to learn
  • Must hold a valid driver’s license and satisfactory driving record
  • Ability to read blueprints
  • Strong work ethic, desire to learn
  • Positions open from Foreman level to Apprentice level
  • Willing to train good candidates and place in the Union
  • Education Level: High School/GED
  • Experience: 4-6 years of relevant job experience (similar industry or essential duties)


Physical Requirements:

  • Ability to sit, climb, balance, stoop, kneel, crouch, and crawl; lift up to 75 lbs.


Pay rates and benefit levels are determined by union classifications which are set by the union.


Network Connex provides a comprehensive benefits package including 401(k), health, dental, vision, life, and disability insurance. Network Connex is an equal-opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, gender, or national origin. Upon acceptance of an offer, all candidates will be required to pass a background check and drug screening

EOE-Minority/Female/Disability/Veteran Network Connex believes all persons are entitled to equal employment opportunities and does not discriminate against its employees or applicants for employment because of race, color, gender, affectional or sexual orientation, domestic partnership status, ancestry, religion, national origin, citizenship status, marital status, disability, veteran status, age or any other protected group status.